日本成人中文字幕-色一色成人网-67194熟妇在线观看线路-国产精品国产亚洲区艳妇糸列短篇-精品国产在天天在线观看-国产又粗又爽又黄-日本免费不卡一区在线电影-亚洲专区av-不卡中文字幕-亚洲第一av无码专区-三浦理惠子av在线播放-亚洲欧洲一区二区三区四区-天天狠天天添日日拍-久久亚洲a v-超碰在线网

ACEG’s First Investment in Yangtze River Bridge Project
  |  Updated: 2024-12-25  |  Views: 3604

Recently, ACEG won the S24 Hangzhou to Hefei Expressway Wuhu Taishan Road Yangtze River Bridge and Connection Works, which is ACEG's first investment in Yangtze River bridge project.

With total investment of about RMB15.5 billion Yuan, 48 months of construction period and 356 months of toll-charging period, it has 30.88km of main line and 14.35km of connection line. The starting point crosses with G4231 Nanjing–Jiujiang Expressway and the ending point with G4211 Nanjing–Wuhu Expressway with 4 toll stations and six locations of interconnection along the whole route.

Included in "Layout Planning of Crossing Passages for Yangtze River Trunk Line (2020-2035)", the project can effectively improve the local expressway network and promote economic and social development along the route. Upon completion, it will play an important role in implementing the national strategy of integration of Yangtze River Delta, promoting high-quality development of Yangtze River Economic Belt.

Since 2024, ACEG has focused on high-quality market development, and successively invested in a number of major franchise projects in Anhui province, achieving reasonable growth in quantity and effective improvement in quality, continuously accelerating ACEG’s development featuring transformation, high-quality and large-scale.